This article for STRUCTURE Magazine’s November 2022 issue outlines the collaboration between the GMS team of Partners Karl Rubenacker and Jessica Mandrick, along with Project Engineer Lizhong Wang, and the building owner, Jack Resnick and Sons.
This article for STRUCTURE Magazine’s November 2022 issue outlines the collaboration between the GMS team of Partners Karl Rubenacker and Jessica Mandrick, along with Project Engineer Lizhong Wang, and the building owner, Jack Resnick and Sons.
April 24 through 27, 2019 GMS Partners Ramon Gilsanz and Karl Rubenacker, as well as Associate Partners Eugene Kim, Jennifer Lan and Jessica Mandrick will travel to Orlando, Florida to attend this year’s ASCE/SEI Structures Congress.
Jessica will be moderating Innovation in Software and Technology for Structural Engineering (Session 508025), Thursday April 25 at 9.30 AM. Ramon will present on Optimal Design of Reinforced Concrete Structures (496799), Friday April 26 at 1.30 PM. Jennifer will present on Findings from the ATC Mexico City Earthquake Reconnaissance (507867), Friday April 26 at 1.30pm (with Ramon as co-presenter) and Ramon and Karl will present different chapters of the ASCE/SEI Design Guide Alternative Load Path Analysis Guidelines for Disproportionate Collapse (504616), Saturday April 27 at 11am.
On Wednesday April 24, Ramon and Karl will meet with the ASCE Standards Committee on Disproportionate Collapse Mitigation and Jessica will chair the SEI Board Young Professional Committee meeting.
Drop us a line if you will be attending, we would love to have a chance to catch up with you while we are there!
Click here to learn more about the Congress http://www.eventscribe.com/2019/STCONG19/ Or follow on Twitter #Structures19
GMS provided structural engineering services for this 440,000 SF interior renovation and re-stack of 9 floors in the McGraw-Hill Building at 1221 Avenue of the Americas. Project included structural modifications and reinforcement for a monumental stairway, health club, full service kitchen and dining area, UPS and data center, as well as roof dunnage and shaft openings for new HVAC equipment.
Zaha Hadid and Related Companies’ new residential building adjacent to the High Line has been in the news over the past few weeks. The condominium will have 39 residences, automated underground parking and a wide range of amenities including a 2,500-square-foot planted sculpture terrace.
Fast-paced construction within a dense urban environment like New York City has several distinctive rationales, approaches, constraints, and requirements for careful coordination.
GMS provided the structural design and structural special inspections and also provided architectural assistance in developing façade/building envelope design details for the 16 story multi-use project. The enclosure is designed as a metal and glass curtain wall beginning above the existing 4-story warehouse. The building aims for LEED gold certification.
“High Rise by the High Line” has been published in Concrete International. This article presents a case study of of Avalon West Chelsea, a new 588,000 SF, “L-shaped” multi-family residential development located in the prime Chelsea Arts District of Manhattan, New York.
Ramon Gilsanz was interviewed by the History Channel for their series Engineering Disasters.
The Applied Technology Council (ATC) was created by practicing professionals with the intent of serving the evolving needs of engineering practice.
SculptureCenter is featured in this month’s issue of Architect magazine.